SUBSTATION SENIOR ENGINEER Published on February 19, :00 AM Department: NCR Operations and Maintenance Region: Head Office Number of vacancies: 1 Key Responsibilities: Responsible for the efficient and effective implementation of substation policies, programs, standards, operation and monitoring of substation equipment and facilities. Power Transformers (5x300MVA, 230kV/115kV) – 1500MVA – in service Power Transformers (2x300MVA, 230kV/115kV) – 600MVA – not in service Capacitor Bank (3x100MVAR) – 300MVAR – in service Incoming 230kV Transmission Lines Taytay-Malaya 230kV Line 1 & 2 (2x4x795MCM ACSR) – 2400MVA Taytay-San Jose 230kV Line 1 & 2 (2x4x795MCM ACSR) – 2400MVA Outgoing 115kV Tie Lines TO1 115kV tie line going to Meralco’s 115kV Switchyard (2x795MCM ACSR) – 300MVA TO2 115kV tie line going to Meralco’s 115kV Switchyard (2x795MCM ACSR) – 300MVA TO3 115kV tie line going to Meralco’s 115kV Switchyard (2x795MCM ACSR) – 300MVA TO4 115kV tie line going to Meralco’s 115kV Switchyard (2x795MCM ACSR) – 300MVA TO5 115kV tie line going to Meralco’s 115kV Switchyard (2x795MCM ACSR) – 300MVA 230kV Conventional Outdoor Switchyard (5 bays) 115kV Conventional Outdoor Switchyard (5 bays) 115kV Metering Facilities Substation Automation System (SAS) / MBSC Protection, control, monitoring and secondary devices for the following: 4x230kV transmission lines 5x115kV transmission lines 5x300MVA power transformer Auxiliary transformer (4 units) Building facilities consisting of 4 buildings Backup generators Fire Suppression System Building Fire Alarm System Responsible for the safe, efficient and reliable operations of the substation. Preparation of substation operational reports. Requirements: Bachelor of Science in Electrical Engineering Registered Electrical Engineer Must have undergone Substation Operation’s Training (PM-OM-01 Rule 4.23) and at least 3 years of relevant experience in Substation Operation English and Filipino literate Good leadership and management skills Good communication skills Basic knowledge of AutoCAD 2D and Microsoft Office Troubleshooting of electrical wiring Perform assigned tasks with less supervision Can read and interpret various schematic diagrams Interested applicants are requested to send their updated resume to . #J-18808-Ljbffr
Substation Senior Engineer
NATIONAL GRID CORPORATION OF THE PHILIPPINES
city of melbourne, city of melbourne
Published 4 days ago
Report job
Similar jobs
Part Time Work From Home Focus Group Panelist. Call Centre Agent Experience Not Required
APEX FOCUS GROUP LLC
Permanent